|
Trimming edge of a spun head.
|
|
1957
Lukens 206 mill expansion.
|
|
Large ingot hot from soaking pit loaded on the 206” rolling mill.
|
|
Flow chart for alloy plate processing.
|
|
1957
Main bay of Lukenweld, Plant #1 Building.
|
|
140-inch mill — note: catwalk is no longer there.
|
|
Stripper crane removing mold from ingot at the electric melt shop.
|
|
1979
Shell being lifted into position at
Electric Melt Shop.
|
|
1962
Spiral grooving of a mill roll to break up slag and oxide providing a better surface quality.
|
|
Gas cutting an ingot in preparation for rolling.
|
|
1972
Gas cutting at Heat treating.
|
|
1972
Flattening roll at 140-inch mill.
|
|
1972
Ingots on in-plant cars.
|
|
Vice-President Jack Faunce and
Joseph Proctor — Application Engineering.
|
|
1971
Inside office personnel, left to right:
Dorothy Mills, Charlie Pluck,
Mary Ellen Coryell, Vinita Vela.
|
| |
|